This is the average cost of building a property in Chinhoyi high density suburbs sitting on a 300sqm land.
*Council Stand costs around $5000
*Cooperative stands costs around $6000
*Stand on slab level costs around $9000
The amounts are of labour costs involved.
Setting Out $150
Excavation/Foundation $250
Footing $150
Box $500
Back Filling and Hardcore $200
Slab $300
Window Level $900
Ring Beam $250
Wall Plate $400
Roof Types
- Gable $600
- Parapet $800
- Hipped $1400
Plastering In $500
Plastering Out $300
Floor Topping $350
Tiling ($4 x 5sqm) $400
A finished full house hipped type goes for around $35 000 while the Gable type goes for $25 000.
Renting a full house costs between $300 - $400
A single room costs between $25 - $40